This project comprised of internal alterations and refurbishment to a number of complete floors and isolated areas within a 1960's in-situ concrete framed college building. The works also included the construction of a new entrance foyer, creating an atrium space to the entrance foyer and a four storey link extension to create new teaching spaces and access between the existing buildings.
Major asbestos removal works were required as an enabling package and refurbishment of 1st floor offices and ground floor office accommodation.
The works also included substantial structural steelwork to the existing and very slim pre-cast concrete structure, to prepare for the removal of a large section of 1st floor slab to create an impressive two storey open foyer. The foyer included a dedicated media wall and a new extension to the front of the building, creating a new meeting area and function room.
Re-modelled & Refurbished Entrance Foyer/Reception Areas
Main Entrance Extension/Lobby
First Floor Meeting Room (Extension)
Re-modelled & Refurbished Registry Reception & Administration Areas
View From Entrance Foyer balcony
External Elevation to Main Entrance Extension
First Floor Balcony from New Meeting Room Area
External Elevation of New Link Extension
External Elevation showing New Link Extension between Existing Buildings
Colchester Institute
Saunders Boston Architects
Aecom
Bidwells
Β£2m
Traditional Tender
Our office will be closing at 13:00 on the 24th December and re-opening on 2nd January 2025* *Sit...
Read Moreπ The C.M. Cadman Group had a successful day at the Essex Business Awards held at Braxted Park!π ...
Read MoreWeβre thrilled to announce that weβve been chosen as the main contractor to transform two vacant ...
Read More